FINAL CAST PART 1

Updated: Aug 23, 2019

In order to get colour the whole way through the piece, casting in batches


Going with colour scheme number 4

Prepping the pieces


post firing

There was some over flow, so there needs to be less glass on top of the melt plates



Lots of leaks due to the kiln paper on the bed which depressed during the firing and left a gap for the glass to flow.

Pieces needed ground down do get rid of issues before the next firing, to minimise chance of clouding

Pieces were washed to remove contaminants and then put back in the moulds for the next layering.


#Mountkeen #process #potmelt #kilnforming #cleanup #madeinscotland

2 views